Citation: | Wu Haiyan, Meng Xin, Zhang Yuzhu, Li Ligang. Research on the Planning Method for Astronomy Observation Mission[J]. Chinese Journal of Space Science, 2013, 33(5): 561-568. doi: 10.11728/cjss2013.05.561 |
[1] |
Wang Jun, Li Jun, Chen Jian, et al. An approach for multi-objective uniting imaging scheduling of Earth observing satellites[J]. J. Astron., 2007, 28(2):354-359. In Chinese (王钧, 李军, 陈健, 等. 多目标EOSs联合成像调度方法[J]. 宇航学报, 2007, 28(2):354-359)
|
[2] |
Huang Xiaojun, Ma Manhao, Qiu Dishan, et al. Solving the cooperative reconnaissance of electronic reconnaissance satellite with a hybrid scheduling algorithm[J]. J. Natl. Univ. Defense Tech., 2011, 33(1):132-137. In Chinese (黄小军, 马满好, 邱涤珊, 等. 电子侦察卫星联合侦察的混合调度算法[J]. 国防科技大学 学报, 2011, 33(1):132-137)
|
[3] |
Liu Wei, Lin Baojun. An intelligentized controlling method for scanning the celestial sphere[J]. J. Astron., 2006, 27(6):1365-1368. In Chinese (刘薇, 林宝军. 卫星巡天扫描运控 模式方法的研究[J]. 宇航学报. 2006, 27(6):1365-1368)
|
[4] |
Johnston M D, Giuliano M E. Multi-objective scheduling for space science missions[J].J. Adv. Comp. Intell. Inf., 2011, 15(8):1140-1148
|
[5] |
Giuliano M E, Hawkins R, Rager R. A status report on development of the JWST long range planning system[C]//Proceedings of the 21st International Conference on Automated Planning and Scheduling. Freiburg: ICAPS, 2011
|
[6] |
Calvani H M, Berman A F, Blair W P, et al. The evolution of the FUSE spike long range planning system[C]//Proceedings of Fourth International Workshop for Planning and Scheduling for Space. Darmstadt: NASA, 2004
|
[7] |
Chen Hao. Planning and Scheduling Method for the Earth's Surface Electromagnetic Environment Detection Satellite Resources[D]. Changsha: National University of Defense Technology, 2009. In Chinese (陈浩. 地表电磁环境探测卫星的资源规 划调度方法[D]. 长沙: 国防科学技术大学, 2009)
|
[8] |
Deb K, Pratap A, Agarwal S, et al. A fast and elitist multi-objective genetic algorithm: NSGA-II[J]. IEEE Trans. Evol. Comp., 2002, 6(2):182-197
|